Step 4: Preview import
What this step is for
See the fully-transformed data before committing. You can still step back from here to fix anything before you import.
How to do it
- Use the table selector to switch between target tables.
- Page through the rows; adjust page size (50 / 100 / 500 / 1000) as needed.
- Check that:
- Row counts look right for each table.
- Columns contain the data you expected.
- Dates, numbers and IDs are formatted correctly.
- (Optional) Click Download to export the transformed table as CSV for offline review.
- If something looks off, click Back to return to Map columns (or further back) and adjust the mapping.
- When everything looks correct, click Import to commit the data.
After import
- Status updates to Completed and you're returned to the asset tape page.
- The imported data is now visible in the read-only table view, ready for downstream use.